Aimed at environments where there is the need for product design and/or manufacturing process development, prior to the effective start of the production. This module is an important complement to the planning cycle, because it ensures the date in which the engineering standards will be available for planning and scheduling, avoiding the generation of inconsistent and not viable plans. This module enables the definition of projects, the list of activities, and the resources required for each activity. A Gantt chart per resource facilitates the load leveling among the available resources (engineers, designers), optimizing its use and assuring the generation of reliable dates for each project. These dates will feed into the minimum dates that production can start, which ensures consistency in scheduling.