SUP

Matches the actual requirements of raw materials and other purchased components, generated by scheduling, with the supply orders placed at the suppliers. Similar to the MRP function, this function allows the application of purchasing policies to each purchased item, such as minimum lots, multiplicity, and delivery frequencies.

Purchasing subordinated to Production

Purchase Orders are generated based on the requirements dates obtained during production scheduling, and therefore represent the dates that the materials will actually be needed in the plant. The result of this process is a purchasing schedule totally synchronized with the production schedule, resulting in extremely positive financial impacts in the supply area.

Rescheduling Suggestion

Through occasional rescheduling agreements with suppliers, the user can inform parameters that will direct this function to generate suggestions for changes, both in dates and quantities, for each purchase order already placed at the supplier, resulting in a better synchronization between purchased and manufactured materials, due to eventual production rescheduling.

Request Demo

Just fill in the form below and our consultant will contact you.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Needing to improve the productivity of your factory?

Implement a Drummer APS system within your industry and significantly increase your productivity, profits and even realize an incredible reduction in delivery times.
Request Demo
+55 11 3275 5363
Rua José Getúlio, 579
12º. andar – Cj. 123. Aclimação – São Paulo/SP
Copyright © 2022 Linter Sistemas. Política de Privacidade.